Chinese(T) | English
contact me
User Login
Username:
Password :

CCIA Design, Integration and Methodology

Index >> Citrix >> CCIA >> "1Y0-611"Exam

VUE/Prometric Code:1Y0-611

Exam Name:CCIA Design, Integration and Methodology
Questions and Answers:60 Q&As
Price:$99
Updated:2008-11-12
CCIA Design, Integration and Methodology
Test Q&A Updated Price
1Y0-611 60 Q&A 2008-11-12 $99

please download in PDF format Demo: 1Y0-611

killtest 1Y0-611 Exam Features

High quality and Value for the 1Y0-611 Exam.
Killtest Practice Exams for CCIA Design, Integration and Methodology 1Y0-611 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.

100% Guarantee to Pass Your CCIA exam and get your CCIA Certification.
We guarantee your success in the first attempt. If you do not pass the 1Y0-611 (CCIA Design, Integration and Methodology) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.

killtest 1Y0-611 Downloadable.
Printable Exams (in PDF format) Our Exam 1Y0-611 Preparation Material provides you everything you will need to take your CCIA exam. The CCIA Certification details are researched and produced by Professional Certification Experts who are constantly using industry experience to produce precise, and logical. You may get CCIA exam questions from different web sites or books, but logic is the key. Our Product will help you not only pass in the first CCIA exam try, but also save your valuable time .

  • Comprehensive questions with complete details about 1Y0-611 exam.
  • 1Y0-611 exam questions accompanied by exhibits.
  • Verified Answers Researched by Industry Experts and almost 100% correct.
  • Drag and Drop questions as experienced in the Real CCIA exam.
  • 1Y0-611 exam questions updated on regular basis.
  • Like actual CCIA Certification exams, 1Y0-611 exam preparation is in multiple-choice questions (MCQs).
  • Tested by many real CCIA exams before publishing.
  • Try free CCIA exam demo before you decide to buy it in http://www.Killtest.com.

High quality and Value for the 1Y0-611 Exam:100% Guarantee to Pass Your CCIA exam and get your CCIA Certification.

http://www.Killtest.com The safer.easier way to get CCIA Certification.

We offer Demo version of Q&A, Q&A are as follows (not to provide picture):

1Y0-611:please download 1Y0-611 in PDF format Demo 1Y0-611

1.According to Citrix Methodology, what is the suggested timeframe of a Proof of Concept?
A.1-30 days
B.4-6 weeks
C.3-6 months
D.Less than 1 week
Correct:A
2.According to the Citrix methodology, what is the recommended next step after a Proof of Concept, if an Infrastructure Assessment has already been performed?
A.Pilot
B.Design
C.Production
D.Build and Test
E.Project Definition
Correct:B
3.In which component of the Proof of Concept would the next steps be defined?
A.Build
B.Design
C.Planning
D.Results Analysis
Correct:D
4.What is the recommended profile solution for a user who accesses published applications in a farm that includes servers in multiple data centers and that requires personal settings for each application?
A.Local profile
B.Roaming profile
C.Mandatory profile
D.Multiple Roaming profile
Correct:D
5.Folder Redirection allows administrators to __________. ( Choose three.)
A.assign a unique Profile Path per user account
B.assign multiple Profile Paths per user account
C.store specific folders from the user's profile on different file shares
D.point Documents to a user's personal folder on a network file share.
E.decrease the amount of data downloaded at logon from the user's profile share
Correct:C D E
6.Scenario : You are designing a user profile design for an environment with three load-managed groups Microsoft Office 2000, ERP application and CRM application. Testing has shown that the ERP and CRM applications do not reference HKCU for application settings. Microsoft Office uses HKCU to save user settings. Design goals: 1. Ensure fastest possible user logins to all applications 2. Allow users to save settings 3. Avoid profile corruption and overwrites Proposed Design: Implement a single roaming profile strategy, with folder redirection policies applied on all servers. The user profile path is configured to:\\PROFILESERVER%username% for all users. Which design goals does this proposed design meet?
A.3 only
B.2 only
C.2 and 3
D.1 and 3
Correct:B
7.Scenario: While reviewing the project plan, you realize the project timelines are not being met. You determine the reasons for the slip in timelines: multiple people are dedicating valuable time working on the same issue and some issues keep reoccurring. Currently, the project team manages an issues list. The list contains a brief description of each issue, the dates it was opened and closed, and each issue's status. What are the first two steps you should take in order to address this problem?(Choose two.)
A.Assign an owner and priority to each issue.
B.Dedicate a project resource to provide ongoing support.
C.Start a support knowledge base that includes a history of issues.
D.Extend project timelines as necessary.
Correct:A C
8.Scenario: During Automation Scripting, the application integration team assisted with the automated server build and application packaging. However, during unit testing, you determined an application was not working properly due to a missing key in the user's registry hive. In order to correct the issue with minimal modification to existing components, you chose to fix the issue by adding the missing key to __________. (Fill in the blank with two options from below.)
A.the application package created by the application integration team
B.the automated server build created by the application integration team
C.the server logon script
D.the group policy
Correct:C D
9.Scenario: During the pilot implementation, it is important to select the appropriate mix of users and IT staff. These users provide feedback that allows the project team to gather hands-on knowledge and experience before moving the environment into production. Once the results of the pilot are obtained, the project team should determine which factor?
A.If all risks have been identified for the project.
B.If they selected the best mix of end users and IT staff for the pilot.
C.If the applications are ready to be deployed in a production environment.
D.If necessary performance counters to monitor average network utilization have been validated.
Correct:C
10.You have just conducted project test cases for the Build and Test phase. Which three pieces of information from the project test cases are most critical to move forward with the project? (Choose three.)
A.Ensure all risks have been identified.
B.Ensure all sections of the design have been verified.
C.Obtain baseline data and metrics including performance data.
D.Identify necessary performance counters to monitor average network utilization.
Correct:A B C
11.Scenario: You recently completed a MetaFrame Access Suite Architecture Design. While the proposed rollout is small, only 5 MetaFrame XP Presentation Servers, the rollout calls for secure web access for external B2B (Business to Business) customers. The deployment will consist of a single third party application that is Windows 2000 certified. The customer has an existing Active Directory structure for the deployment which they will rely on to deploy security policies. However, they plan to use local anonymous user accounts to allow access to B2B customers. Your next task is to create a project plan for the Build and Test phase of the deployment. Given the requirements listed above, which step of the Build and Test phase have the highest priority in your project plan?
A.All steps are of equal priority
B.Automation Scripting and Environment Build
C.Application Integration and Environment Build
D.Infrastructure Integration and Profile and Policies Implementation
Correct:D
12.Scenario: You've successfully deployed the MetaFrame Access Suite for a law enforcement agency. Their previous architecture included 2,000 PCs that were replaced every three years. In addition, close to 200 users connected to the system remotely through Dial-Up (RAS). Since the onset of the initiative it was clear that the success of the migration would be tied to hard cost benefits. Total Cost of Ownership (TCO) figures for the legacy system are available. The project team intends to leverage those figures to compare the Return of Investment (ROI) of the solution. Which three metrics will need to be taken into account in order to accurately measure the TCO of the MetaFrame Access Suite deployment? (Choose three.)
A.User Concurrency
B.ICA Bandwidth Consumption
C.Number of application upgrades per year
D.Peak server CPU and memory utilization figures
E.Results from user quality and satisfaction surveys
Correct:A B C
13.Scenario: You recently completed a complex, MetaFrame Access Suite Architecture Design that includes the deployment of 100 MetaFrame XP Presentation Servers across six data centers. The deployment will consist primarily of Microsoft Office Suite including Microsoft Outlook. The proposed design will contain Pentium III servers with 2 processors and 1GB of RAM. These servers will host the entire MetaFrame Access Suite to provide remote SSL access to applications and content. A test environment will also be created using the same server make, model, and configuration. MetaFrame XP Presentation Servers in the test environment will belong to the production farm. Which two options would be difficult to test based on the production and test environments outlined above? (Choose two.)
A.Network utilization
B.Feature releases, service packs, and/or hotfixes
C.Application Scalability and Application Integration
D.Application Integration procedures and proposed LMGs (Load Managed Groups)
Correct:B D
14.Scenario: You recently completed a MetaFrame XP Presentation Architecture Implementation that includes the deployment of 20 MetaFrame XP Presentation Servers across two data centers in the US. The deployment will support the 700 users from Sales and Marketing which are distributed across the US and Latin America. Latin America and 25% of the sales force will access the system through Secure Gateway and Web Interface for MetaFrame. The Project Team is deciding how to deploy the MetaFrame Access Suite to production users. What would be the optimal order for deploying services to users during the Production Rollout?
A.Internal US Sales then Marketing then Remote Workforce
B.All of US Sales then Marketing then Latin America
C.Sales then Marketing
D.Marketing then Sales
Correct:A
15.Scenario: You are in the process of developing a virtual user script to simulate load and test server scalability. Which two factors do you need to consider when creating the script? (Choose two.)
A.User workflows and printing requirements
B.Type of user (i.e., normal user, power user)
C.User work schedules, shifts, idle periods, lunch breaks
D.Total number of users expected in the production environment (Concurrency)
Correct:A B
16.Scenario: You are implementing a new application into an existing MetaFrame XP Presentation Server farm in which all users have roaming profiles. All users and servers are part of an Active Directory domain. You have configured group policies so that profiles are deleted upon logoff. You have a new application that you will be deploying in the farm that writes per-user INI files to the Application Data subfolder of the user profile. Design Goals: 1. Provide the ability to maintain the per-user settings in the INI files across sessions. 2. Provide the fastest possible logins. How can these design goals be achieved?
A.Implement a policy to delete profiles on logoff.
B.Implement an application compatibility script run at login.
C.Implement folder redirection on the Application Data folder.
D.Implement an application compatibility script to run at install time.
Correct:C
17.You are testing an application for a MetaFrame XP Presentation Server deployment and find that the following registry key is used by the application to locate application settings: HKLM\Software\Application\SettingsPath Value: c:\Program Files\Application\Settings.ini How can this issue be addressed?
A.Use a hybrid profile.
B.Use a roaming profile.
C.Update the value for the registry key to the user's home drive.
D.Install the application into its own Load Managed Group (LMG).
Correct:C
18.Which two options are solutions to the problem of DLL conflicts, which can occur when installing applications on the same server? (Choose two.)
A.DLL redirection
B.Load Managed Groups
C.Seamless applications
D.Application Compatibility Script
Correct:A B
19.Scenario: You are testing an application called ReportApp and find out that it references the default Report Path setting in the following registry key: Key: HKLM\Software\ReportApp\RepPath Type: REG_SZ Value: c:\program files\ReportApp\ Design Goals: 1. Ensure that users' reports are output to user-specific locations 2. Minimize administrative effort 3. Provide the best performance How can all these goals be accomplished?
A.Set a home directory as H:\ for each user, and implement an application compatibility script run during user login.
B.Set a home directory as H:\ for each user, and implement an application compatibility script run at install time.
C.Reinstall the server with remapped drives, install the application to the M: drive, and map the C:\ drive as the user's home directory.
D.Reinstall the server with remapped drivers, install the application to the M: drive, and map the N:\ drive as the user's home directory.
Correct:A
20.Which three steps must be taken when conducting an infrastructure assessment? (Choose three.)
A.Create an agenda with topics for discussion.
B.Measure benefits and disadvantages of any scope changes.
C.Consider freezing all scope changes at critical points in the project.
D.Present findings to the project stakeholders and sponsors as appropriate.
E.Run resource-gathering utilities as necessary to validate components of the assessment.
Correct:A D E
21.What is the purpose of the criticality assessment?
A.To measure the necessity of a component in the environment
B.To measure the consistency of the application of best practices
C.To measure the effectiveness of a suggested design on an environment
D.To measure the importance of a component on the environment as a whole
Correct:D
22.Scenario: You are an architect on assignment at a company that has requested an Infrastructure Assessment (IA). The company has implemented MetaFrame XP Presentation Server on a limited scale to provide remote users access to published applications and would like to rollout the implementation enterprise-wide. During the initial rollout, they have had some challenges with printing and server security and would like to ensure that these issues are corrected prior to the enterprise rollout. What kind of IA will you conduct?(Choose two.)
A.Expansion
B.Standalone
C.Health Check
D.Full Life-cycle
Correct:A B
23.Scenario: You designing a MetaFrame XP Presentation Server farm for a customer that will be hosting SAP and Siebel for its call center users worldwide. Users will be located in Bangalore and Miami. The SAP application and database servers are located in Chicago, USA and the Siebel application and database servers are located in London. Testing has shown that Siebel and SAP can be run properly on the same MetaFrame XP Presentation Server without issues. Both applications will be updated quarterly. Your customer has distributed IT functions, and separate groups manage the SAP and Siebel applications in London and Chicago, respectively. Network latency between the different sites is as follows: Bangalore and London 500 ms Bangalore and Chicago 300 ms Miami and Chicago 75 ms Miami and London 150 ms Chicago and London 150 ms How many Load-Managed Groups (LMGs) would you recommend?
A.1
B.2
C.3
D.4
Correct:B
24.Scenario: You are designing a MetaFrame XP Presentation Server farm for a customer that will be hosting SAP and Siebel for its call center users worldwide. Users will be located in Bangalore and Miami. The SAP application and database servers are located in Chicago, USA and the Siebel application and database servers are located in London. Testing has shown that Siebel and SAP can be run properly on the same MetaFrame XP Presentation Server without issues. Both applications will be updated quarterly. Your customer has distributed IT functions, and separate groups manage the Siebel and SAP applications in London and Chicago, respectively. Network latency between the different sites is as follows: Bangalore and London 500 ms Bangalore and Chicago 300 ms Miami and Chicago 75 ms Miami and London 150 ms Where should the MetaFrame XP Presentation Servers be located?
A.Chicago and London
B.Bangalore and Miami
C.Bangalore, Chicago, and London
D.Bangalore, Miami, Chicago, and London
Correct:A
25.Scenario: You are building a MetaFrame XP Presentation Server farm within an Active Directory environment. All servers and users are part of an active directory domain called nterprise.local. Within the enterprise.local domain, you configure an OU called MetaFrame Servers and assign a GPO to the OU. The GPO you create includes user and machine policies, and is configured with a loopback processing mode of eplace. All MetaFrame XP Presentation Servers are placed in the MetaFrame Servers OU. After you apply the policies, you log in as a user to test your configurations. You notice that not all policies are being applied to the session. What can be done to address the problem?
A.Configure a mandatory profile for the user.
B.Create a new OU for MetaFrame users?and apply the user-related policies as a GPO to this OU.
C.Execute the command ecedit /refreshpolicy machine_policy on all servers in the "MetaFrame Servers" OU.
D.Create a new OU for the MetaFrame users,apply a GPO to this new OU, and apply loopback processing with eplace mode to this GPO.
Correct:C
26.Which policy can optimize disk performance?
A.Enabling auto-end tasks
B.Maximizing Page Table Entries (PTEs)
C.Increasing the number of Idle Winstations
D.Disabling the Last Access Update value for NTFS
Correct:D
27.You are designing security lockdowns and polices for a MetaFrame XP Presentation Server farm. Servers and users will be part of an NT Domain. What would be the best approach for configuring policies?
A.Use system policies for the OU for Users in the NT domain.
B.Use Group Policies for the OU for Servers in the NT domain.
C.Use system policies for the OU for Servers in the NT domain.
D.Use local system policies on each server, including machine and user policy settings.
Correct:D
28.Scenario: You are deploying a 50-server MetaFrame XP Presentation Server farm with 3 load managed groups. All servers are to be built using an automated script. Included in this script is a set of CACLS commands that locks down the \winnt\system32 folder for non-administrative users. Applications will be deployed using installation manager and packaged groups. You have an application in one of the load managed groups which requires full Access to the \winnt\system32 folder. How should you address this problem?
A.Create a new package group.
B.Change the CACLS script to change permissions on \winnt\system32.
C.Create an application compatibility script to run at login to provide full access permissions for users on \winnt\system32.
D.Create an application compatibility script to run at installation to provide full access permissions for users on \winnt\system32.
Correct:D
29.If MetaFrame XP Presentation Servers are not physically collocated and plugged into the same switch, what technology will provide the best solution to allow the servers to reside logically on the same subnet?
A.Virtual LAN
B.NIC teaming
C.Multi-homing
D.DHCP relay agent
Correct:A
30.Scenario: You are planning a server build process for a server farm consisting of more than 100 MetaFrame XP Presentation Servers. You have applications which will require server drives to be remapped from C: to M: Requirements: 1. Greatest flexibility for new applications 2. Greatest flexibility for new hardware Proposed Build Process: Create a ghost image of server build which includes installation of the OS, drive remapping process, and MetaFrame XP Presentation Server install. Which of the following requirements does the proposed build process meet?
A.1 only.
B.2 only.
C.1 and 2.
D.None.
Correct:D